The case

In cement production, the mill gearbox is one of the most critical assets in the entire process chain. For a South African cement producer operating a RENK KPBV gearbox, an unexpected failure would result in a complete plant shutdown, with downtime costs potentially reaching six figures per day.

With replacement parts often requiring weeks or even months to procure, reacting once damage becomes visible is not a viable strategy.

Early and reliable fault detection is the key to avoiding costly production interruptions.

The challenge

Our condition monitoring experts detected the first indication of an inner-ring bearing defect 1,124 days before the actual repair was required. More than three years before any intervention became necessary.

The customer was informed approximately 800 days in advance, initiating a structured monitoring program with severity assessments and detailed reporting every six months over a period of 27 months.

The challenge was not identifying the fault. The challenge was managing the long period between the initial indication and the point where corrective action became necessary, while ensuring uninterrupted production and maintaining confidence in the asset's condition.

The solution

Detecting an anomaly is only the first step. The real value lies in correctly interpreting the data and turning insight into action.

Working closely with the customer, RENK experts:

  • Assessed and classified the severity of the initial vibration anomaly.
  • Established a proactive monitoring strategy to continuously evaluate gearbox condition.
  • Enabled informed decision-making based on trend development rather than assumptions.
  • Supported long-term maintenance planning, allowing the operator to secure spare parts, allocate resources, and schedule the bearing replacement at the most suitable time.

This approach ensured that production could continue safely while the known risk was continuously monitored and managed.

The result

The cement producer successfully avoided an unplanned plant shutdown and prevented severe secondary gearbox damage.

By detecting the fault at an exceptionally early stage and continuously monitoring its development, RENK provided the time needed to plan maintenance proactively rather than react under pressure.

1,124 days of advance warning.
0 days of unplanned downtime.

contact

Get in touch with our experts

Digital Solutions Team

Get in touch with our engineering experts to discuss your questions and how we can contribute to your project success. 

Digital Solutions Team
Email
[email protected]

Digital Solutions Team